PROJECT Description
Location
Between Ang Mo Kio Avenue 3 and Avenue 9. Completion Year
2026 (In progress)
PROJECT Description
Location: Tanah Merah Completion Year
2024 (In progress). Awards LTA Annual Safety Award Convention 2019 - CHAMPION
LTA Contractors Challenge Shield
Safety & Health Certificate of Excellence & Finalist (Category A)
Accident-Free Recognition Award (Category 1)
WSH Performance (SHARP) Award 2019
PROJECT Description
Construction of a nine-storey light industrial building with one level of basement carpark and two roof floors, and a covered walkway to Republic Polytechnic
Location: Junction of Woodlands Avenue 4 and 9. Completion Year
2020 (In progress). JTC Construction Safety Award 2020
PROJECT Description
The scope of the contract includes the demolition of the existing main block and its reconstruction for use as a mixed development with a retail podium and serviced residence.
The adjoining annex block will undergo major refurbishment to include retail and parking facilities and also a rooftop commercial-cum-culture space.
Location 2 Serangoon Road. Completion Year TOP obtained on 26 Nov 2019. Awards WSH Performance (SHARP) Award 2019
PROJECT Description
Location: Harbour Drive. Completion Year 2021 (In progress)
PROJECT Description
Location: Bedok Rise
Awards
PROJECT Description
Location: Compassvale Bow, Singapore / Awards BCA Green Mark Gold Award, 2011
The architectural works sub-contract for Tanah Merah Station involves the upgrading of the headway and conversion of two of the existing platforms to the TEL system. A new elevated six-car island platform will also be constructed. Other additional alteration works include the upgrading of the public toilets and family facilities.
The project is expected to be completed in 2024.
Addition and alteration works to St James Power Station, a national monument gazetted in 2009.
The scope of the project includes conservation works, introduction of new passenger and service lifts, replacement of surface parking lots with landscaping and roofing works.
The project is expected to be completed in 2020.
Highway 407 East Phase 2
Extend Highway 407 as a four-lane highway about 22 kilometres
Extending from Harmony Road in Oshawa to Highway 35/115 in Clarington
Project Overview
Extend Highway 407 about 22 kilometres from Harmony Road in Oshawa to Highway 35/115 in Clarington; connect Highways 401 and 407 East with a 10-kilometre Highway 418 that will serve as a north-south freeway; provide eight new interchanges, including three freeway-to-freeway connections to Highway 407 East and Highway 401 from Highway 418 and Highway 35/115.
The Highway 407 East Phase 2 will be a toll road and owned by the Ontario government.
Turcot Interchange
The Project is a hub for road traffic in Montréal area interconnecting highways
Turcot interchange is a hub for road traffic in Montréal area interconnecting highways 15, 20 and 720 in addition of facilitating access to the Champlain Bridge.
Project Overview
Turcot interchange is a hub for road traffic in Montréal area interconnecting highways 15, 20 and 720 in addition of facilitating access to the Champlain Bridge. It is also an essential road link between Montreal-Pierre-Elliott Trudeau international airport and downtown Montréal and has a traffic volume of more than 300 000 vehicles per day. The Turcot Project includes the reconstruction of Angrignon, De La Vérendrye and Montréal-Ouest interchanges, and adjacent sections of highways 15, 20 and 720
The objective of this design-build project is to build a complex of interchanges and highways connected to the existing road network, capable of providing users with a high level of road safety, service and comfort while maximizing the infrastructure’s lifespan.
The project includes:
Rebuilding four major interchanges and sections of three highways;
Moving a section of highway and railway to allow for future development of the Turcot Yard;
Adding dedicated lanes for modal transport (bus and taxi);
Significantly reducing the number of structures;
Improving the geometry of the road layout;
Re-establishing conventional east-west traffic flow on the A-20;
Building new links to the local road network;
Adding bike paths.
Air Rail Link Spur
3 km long 2 rail guideway
Agencies Involved:
Greater Toronto Airport Authority
City of Mississauga
Region of Peel
Coordination of utilities relocations for Cable, Gas & Watermains
Sir Adam Beck Tunnel Facility Inlet and Outlet Structures
Construction of 10.4 km of a 14.4m Diameter Tunnel including Inlet & Outlet Structures
Agencies Involved:
Canada - Department of Fisheries and Oceans
The full construction of the tunnel includes the removal of 2.1 million cubic meters of rock and fill and the placement of a concrete tunnel lining totalling 400,000 cubic meters of concrete. Included in the design and construction at the upstream end of the tunnel in the Niagara River is a circular cell cofferdam, a concrete acceleration wall, a concrete pier extension, and an ice deflection groyne.
Included in the design and construction at the downstream end of the tunnel in the Pump Generating Station Channel (PGS) is the removal of the rock plug underwater and the demolition and removal of the PGS Structure. Also included in the design and construction are two concrete structures at the inlet and outlet of the tunnel totalling over 10,000 cubic meters of concrete.